/Slumville/ 2×2 L1 Wood shack

Cities: Skylines Mods |

/Slumville/ 2×2 L1 Wood shack


A bare minimum shack for slum cims.

Slumville is an asset pack aims to recreate what it feels to live in poverty, to be the unlucky one. Most assets are low level housings, and thus should be easy to build right from the get go.

> Recommend to use with:

. Control building level up to prevent your slum district from upgrading.

. Building Themes if you wish to have a whole district.

. Find it ! if you wish to manually placing each house.

> Asset stat:

– Main: 461 tris. 512x Diffuse, Normal, Specular.
– LOD: 104 tris. 128x Diffuse, Normal, Specular.

Credits
NEETAH
1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

This content was uploaded by website visitors. If you notice any mistake, please let us know.


If you haven’t heard about the Cities: Skylines Mods, it’s definitely the time to be introduced. These additional files provide a gamer with extra features which are not originally included to the game. Cities: Skylines Mods free files are costless and can accessed by everyone who is interested. The Cities: Skylines Mods download can be completed easily without putting much effort. All you need to do is save the file to your PC and follow the instructions. There should be any problem with that, so no worries. Huge mass of players is using Cities: Skylines Mods around the world, so you shouldn’t stay behind – just click on Cities: Skylines Mods download button and go for the amazing upgrade! The Cities: Skyline game will change massively and it’s all for the best. Who could refuse adding useful functionality to the game? Definitely not you! So complete Cities: Skylines Mods download and take a look at the new version of the game made exactly by you. Sounds fascinating, isn’t it? But it’s better seeing yourself and fulfilling your craziest ideas. We bet there is bunch of them! Express your creativity and make it as useful as never before. It’s definitely a chance to take!



Useful Information:
- Cities: Skylines 2 Mods
- About Cities: Skyline Game
- How to Install Cities: Skylines Mods

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *