L2 4x4WBS70

Cities: Skylines Mods |

L2 4x4WBS70


L2 High Density Resitential Building, moddeld after the famous DDR Plattenbau WBS 70. Compered to the Level 1 version this one comes with an Handrail for the stairs.
The model has 750 Tris, the LOD-Mesh under 100. Model comes with Iluminationmap, and colour Variations. Textures are 1024×1024. LOD Textures 128×128.

WBS 70 (Wohnungsbauserie 70th series) is a type of dwelling that was built in the German Democratic Republic using slab construction. It was developed in the early 1970s by the German Academy of Architecture and the Technical University of Dresden. In 1973, the first block in the city was Neubrandenburg built and this house is now a historical monument. Of the approximately 1.52 million dwellings constructed in slab construction to 1990, the Type 70 WBS is widespread, accounting for up to 42 percent of housing constructed in the East.

Credits
Stewie
1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

This content was uploaded by website visitors. If you notice any mistake, please let us know.


If you haven’t heard about the Cities: Skylines Mods, it’s definitely the time to be introduced. These additional files provide a gamer with extra features which are not originally included to the game. Cities: Skylines Mods free files are costless and can accessed by everyone who is interested. The Cities: Skylines Mods download can be completed easily without putting much effort. All you need to do is save the file to your PC and follow the instructions. There should be any problem with that, so no worries. Huge mass of players is using Cities: Skylines Mods around the world, so you shouldn’t stay behind – just click on Cities: Skylines Mods download button and go for the amazing upgrade! The Cities: Skyline game will change massively and it’s all for the best. Who could refuse adding useful functionality to the game? Definitely not you! So complete Cities: Skylines Mods download and take a look at the new version of the game made exactly by you. Sounds fascinating, isn’t it? But it’s better seeing yourself and fulfilling your craziest ideas. We bet there is bunch of them! Express your creativity and make it as useful as never before. It’s definitely a chance to take!



Useful Information:
- Cities: Skylines 2 Mods
- About Cities: Skyline Game
- How to Install Cities: Skylines Mods

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *